Reports to Governing Bodies
Report Year:
2020 | 2019 | 2018 | 2017 | 2016 | 2015 | 2014 | 2013 | 2012 | 2011 | 2010 | 2009 | 2008
2007 | 2006 | 2005 | 2004 | 2003 | 2002 | 2001 | 2000 | 1999 | 1998 | 1997 | 1996 | 1995
(All documents below are in pdf.)
2024
REPORTING SYMBOL Reporting Date |
Description of Report |
---|---|
A/79/309 (Part I) A/79/309 (Part I)/Add.1) 09 August 2024 |
Activities of the Office of Internal Oversight Services for the period from 1 July 2023 to 30 June 2024 |
E/AC.51/2024/4 1 March 2024 |
Triennial review of the implementation of recommendations made by the Committee at its sixty-first session on the inspection of the evaluation function of the United Nations Entity for Gender Equality and the Empowerment of Women (UN-Women): Report of the Office of Internal Oversight Services |
S/2024/199 29 February 2024 |
Evaluation of the Methods and Work of the International Residual Mechanism for Criminal Tribunals |
E/AC.51/2024/3 28 February 2024 |
Triennial review of the implementation of recommendations made by the Committee at its sixty-first session on the evaluation of United Nations support for the New Partnership for Africa’s Development provided by programme 9 through the Office of the Special Adviser on Africa, the Economic Commission for Africa and the Department of Global Communications: Report of the Office of Internal Oversight Services |
E/AC.51/2024/2 28 February 2024 |
Triennial review of the implementation of recommendations made by the Committee at its sixty-first session on the evaluation of the Department of Economic and Social Affairs: Report of the Office of Internal Oversight Services |
A/78/301 (Part II) 18 February 2024 |
Activities of the Office of Internal Oversight Services for the period from 1 January to 31 December 2023 |
A/78/767 9 February 2024 |
Audit of acquisition of aviation services in United Nations peace operations |
A/78/742 29 January 2024 |
Evaluation of the UNMISS contribution to the strengthening the rule of law and accountability in South Sudan |
2023
REPORTING SYMBOL Reporting Date |
Description of Report |
---|---|
A/78/301 (Part I) A/78/301 (Part I)/Add.1 09 August 2023 |
Activities of the Office of Internal Oversight Services for the period from 1 July 2022 to 30 June 2023** |
A/78/225 25 July 2023 |
Evaluation of the implementation of a flexible workplace at United Nations Headquarters |
A/78/70 21 March 2023 |
Biennial report on strengthening the role of evaluation and the application of evaluation findings on programme design, delivery and policy directives |
E/AC.51/2023/7 20 March 2023 |
Thematic evaluation of the youth, peace and security agenda: youth participation: Report of the Office of the Internal Oversight Services |
E/AC.51/2023/6 15 March 2023 |
Evaluation of Economic and Social Commission for Asia and the Pacific: subprogramme 4, Environment and development |
E/AC.51/2023/5 8 March 2023 |
Evaluation of Economic Commission for Europe: subprogramme 4, Economic cooperation and integration, and subprogramme 6, Trade |
E/AC.51/2023/4 22 February 2023 |
Evaluation of Economic and Social Commission for Western Asia: subprogramme 3, Shared economic prosperity |
E/AC.51/2023/3 21 February 2023 |
Thematic evaluation of United Nations Secretariat support to the Sustainable Development Goals |
A/77/278 (Part II) 18 February 2023 |
Activities of the Office of Internal Oversight Services on peace operation for the period from 1 January 2022 to 31 December 2022 |
A/77/739 13 February 2023 |
Outcome evaluation of the support provided by the United Nations Multidimensional Integrated Stabilization Mission in the Central African Republic for the fight against impunity, the extension of State authority and the rule of law in the Central African Republic |
A/77/734 10 February 2023 |
Evaluation of the contribution of the United Nations Interim Administration Mission in Kosovo to the rule of law |
E/AC.51/2023/2 18 January 2023 |
Evaluation of the Development Coordination Office regional support |
2022
REPORTING SYMBOL Reporting Date |
Description of Report |
---|---|
A/77/278 (Part I) A/77/278 (Part I)/Add.1 9 August 2022 |
Activities of the Office of Internal Oversight Services for the period from 1 July 2021 to 30 June 2022 |
A/77/83 1 June 2022 |
Evaluation of Women, Peace and Security in field-based missions: Elections and Political Transitions |
E/AC.51/2022/12 21 March 2022 |
Evaluation of subprogramme 1 of the Economic Commission for Africa, on macroeconomic policy and governance |
E/AC.51/2022/11 18 March 2022 |
Triennial review of the implementation of the recommendations from the programme evaluation of the offices of the Special Representatives recommendations of the Secretary-General for Children and Armed Conflict, on Sexual Violence in Conflict and on Violence against Children |
E/AC.51/2022/10 18 March 2022 |
Triennial review of the implementation of the recommendations in the programme evaluation of the former Department of Public Information (now the Department of Global Communications) |
E/AC.51/2022/9 17 March 2022 |
Triennial review of the implementation of recommendations made by the Committee at its fifty-ninth session on the evaluation of the Office of Human Resources Management |
E/AC.51/2022/8 17 March 2022 |
Triennial review of the implementation of recommendations on the programme evaluation of the Office of Legal Affairs |
E/AC.51/2022/7 16 March 2022 |
Evaluation of the Economic Commission for Latin America and the Caribbean – Subprogramme 3: Macroeconomic Policies and Growth |
E/AC.51/2022/6 14 March 2022 |
Triennial review of the implementation of the recommendations made by the Committee at its fifty-ninth session on the evaluation of the Office of the United Nations High Commissioner for Refugees |
E/AC.51/2022/5 14 March 2022 |
Triennial review of the implementation of recommendations on the programme evaluation of the Office for Disarmament Affairs |
E/AC.51/2022/4 14 March 2022 |
Triennial review of the implementation of recommendations on the programme evaluation of the United Nations Environment Programme |
E/AC.51/2022/3 9 March 2022 |
Triennial review of the implementation of the recommendations in the evaluation of the Department for General Assembly and Conference Management |
E/AC.51/2022/2 2 March 2022 |
Evaluation of the Development Coordination Office: contribution of the resident coordinator system to country-level programme coherence |
S/2022/148 23 February 2022 |
Review of the methods and work of the International Residual Mechanism for Criminal Tribunals |
A/76/281 (Part II) 18 February 2022 |
Activities of the Office of Internal Oversight Services on peace operations for the period from 1 January to 31 December 2021 |
A/76/707 17 February 2022 |
Outcome evaluation of United Nations Organization Stabilization Mission in the Democratic Republic of the Congo support provided to the rule of law and security institutions in the Democratic Republic of the Congo |
A/76/698 14 February 2022 |
Outcome evaluation of the contribution of the United Nations Multidimensional Integrated Stabilization Mission in Mali to the rule of law and the fight against impunity in Mali |
A/76/697 14 February 2022 |
Thematic evaluation of political affairs in peacekeeping missions |
2021
REPORTING SYMBOL Reporting Date |
Description of Report |
---|---|
A/76/595 13 December 2021 |
Audit of demand and source planning for peace operations |
A/76/197 17 August 2021 |
Audit of the activities, performance and results of staff support provided to the human rights treaty body system by the Office of the United Nations High Commissioner for Human Rights |
A/76/281 (Part I) A/76/281 (Part I)/Add.1 10 August 2021 |
Activities of the Office of Internal Oversight Services for the period from 1 July 2020 to 30 June 2021 |
A/76/139 14 July 2021 |
Audit of implementation of post-employment restrictions for staff involved in the procurement process |
A/75/820 22 March 2021 |
Evaluation of the prevention, response and victim support efforts against sexual exploitation and abuse by United Nations Secretariat staff and related personnel |
E/AC.51/2021/7 19 March 2021 |
Inspection of the evaluation function of UN-Women |
A/76/69 18 March 2021 |
Strengthening the role of evaluation and the application of evaluation findings on programme design, delivery and policy directives |
E/AC.51/2021/6 16 March 2021 |
Evaluation of the United Nations Office on Drugs and Crime |
A/75/803 8 March 2021 |
Evaluation of the organizational culture in peacekeeping operations |
E/AC.51/2021/5 5 March 2021 |
Evaluation of the Department of Economic and Social Affairs |
E/AC.51/2021/4 4 March 2021 |
Evaluation of the United Nations Support to the New Partnership for Africa’s Development (NEPAD) through OSAA/ECA/DGC Programme 9 |
A/75/787 1 March 2021 |
Evaluation of the relevance, effectiveness and efficiency of the African Union-United Nations Hybrid Operation in Darfur in supporting transition from peacekeeping to peacebuilding in Darfur in collaboration with United Nations country team |
E/AC.51/2021/3 26 February 2021 |
Evaluation of the Department of Political and Peacebuilding Affairs |
E/AC.51/2021/2 19 February 2021 |
Evaluation of the United Nations Office of the High Representative for the Least Developed Countries, Landlocked Developing Countries and Small Island Developing States |
A/75/301 (Part II) 19 February 2021 |
Activities of the Office of Internal Oversight Services on peace operations for the period from 1 January to 31 December 2020 |
2020
REPORTING SYMBOL Reporting Date |
Description of Report |
---|---|
A/75/301 (Part I) A/75/301 (Part I)/Add.1 10 August 2020 |
Activities of the Office of Internal Oversight Services for the period from 1 July 2019 to 30 June 2020 |
A/75/215 21 July 2020 |
Audit of governance mechanisms and related processes in the Office of Investment Management of the United Nations Joint Staff Pension Fund |
S/2020/236 26 March 2020 |
Evaluation of the Methods and Work of the International Residual Mechanism for Criminal Tribunals |
E/AC.51/2020/8 20 March 2020 |
Triennial review of recommendations from the programme evaluation of the Office of the United Nations High Commissioner for Refugees |
E/AC.51/2020/7 18 March 2020 |
Triennial review of recommendations from the programme evaluation of the United Nations Department of Political Affairs |
E/AC.51/2020/4 18 March 2020 |
Triennial review of recommendations from the programme evaluation of the United Nations Relief and Works Agency for Palestine} |
E/AC.51/2020/6 17 March 2020 |
Triennial review of recommendations from the programme evaluation of the Office for the Coordination of Humanitarian Affairs |
E/AC.51/2020/5 17 March 2020 |
Triennial review of recommendations from the thematic evaluation of the regional commissions |
E/AC.51/2020/3 11 March 2020 |
Triennial review of recommendations from the programme evaluation of the Economic and Social Commission for Western Asia |
E/AC.51/2020/2 10 March 2020 |
Triennial review of recommendations from the programme evaluation of the Economic Commission for Europe |
A/74/305 (Part II) 19 February 2020 |
Activities of the Office of Internal Oversight Services on peace operations for the period from 1 January to 31 December 2019 |
2019
REPORTING SYMBOL Reporting Date |
Description of Report |
---|---|
A/74/305 (Part I) 13 August 2019 A/74/305 (Part I)/Add.1 |
Activities of the Office of Internal Oversight Services for the period from 1 July 2018 to 30 June 2019 |
A/74/281 5 August 2019 |
Audit of the international component of the Extraordinary Chambers in the Courts of Cambodia |
E/AC.51/2019/9 25 March 2019 |
Evaluation of the Office of Legal Affairs |
E/AC.51/2019/8 25 March 2019 |
Evaluation of the Office of the United Nations High Commissioner for Refugees |
E/AC.51/2019/7 22 March 2019 E/AC.51/2019/7/Corr.1 |
Evaluation of the United Nations Environment Programme |
A/74/67 20 March 2019 A/74/67/Corr.1 |
Strengthening the role of evaluation and the application of evaluation findings on programme design, delivery and policy directives |
E/AC.51/2019/6 14 March 2019 |
Evaluation of the offices of the Special Representatives of the Secretary-General for Children and Armed Conflict, on Sexual Violence in Conflict and on Violence against Children |
E/AC.51/2019/5 13 March 2019 |
Evaluation of the Department for General Assembly and Conference Management |
E/AC.51/2019/4 7 March 2019 |
Evaluation of the Office for Disarmament Affairs |
E/AC.51/2019/3 25 February 2019 |
Evaluation of the Office of Human Resources Management |
E/AC.51/2019/2 22 February 2019 |
Evaluation of the Department of Public Information |
A/73/324 (Part II) 12 February 2019 |
Activities of the Office of Internal Oversight Services on peace operations for the period from 1 January to 31 December 2018 |
2018
REPORTING SYMBOL Reporting Date |
Description of Report |
---|---|
A/73/341 6 September 2018 |
Comprehensive audit of the governance structure and related processes of the United Nations Joint Staff Pension Board (OIOS remarks on comments in the “Report of the United Nations Joint Staff Pension Board” (A/73/9) on the “Comprehensive audit of the governance structure and related processes of the United Nations Joint Staff Pension Board” (A/73/341) and status of recommendations) |
A/73/324 (Part I) 14 August 2018 A/73/324 (Part I)/Add.1 |
Activities of the Office of Internal Oversight Services for the period from 1 July 2017 to 30 June 2018 |
E/AC.51/2018/2 19 March 2018 |
Triennial review of the implementation of the recommendations from the programme evaluation of the United Nations Human Settlements Programme |
E/AC.51/2018/3 19 March 2018 |
Triennial review of the implementation of the recommendations from the programme evaluation of the Economic and Social Commission for Asia and the Pacific |
E/AC.51/2018/4 15 March 2018 |
Triennial review of the implementation of the recommendations from the programme evaluation of the United Nations Conference on Trade and Development |
E/AC.51/2018/6 15 March 2018 |
Triennial review of the implementation of the recommendations from the programme evaluation of the Office of the United Nations High Commissioner for Refugees |
E/AC.51/2018/7 15 March 2018 |
Triennial review of the implementation of the recommendations from the programme evaluation of the Economic Commission for Latin America and the Caribbean |
E/AC.51/2018/8 15 March 2018 |
Triennial review of the implementation of the recommendations from the programme evaluation of the International Trade Centre |
S/2018/206 8 March 2018 |
Evaluation of the methods and work of the International Residual Mechanism for Criminal Tribunals |
E/AC.51/2018/5 E/AC.51/2018/5/Corr.1 |
Triennial review of the implementation of recommendations on the programme evaluation of the United Nations Entity for Gender Equality and the Empowerment of Women (UN-Women) |
A/72/330 (Part II) 19 February 2018 |
Activities of the Office of Internal Oversight Services on peace operations for the period from 1 January to 31 December 2017 |
2017
REPORTING SYMBOL Reporting Date |
Description of Report |
---|---|
A/72/330 (Part I) A/72/330 (Part I)/Add.1 |
Activities of the Office of Internal Oversight Services for the period from 1 July 2016 to 30 June 2017 |
E/AC.51/2017/10 |
Evaluation of the Office of the United Nations High Commissioner for Refugees (UNHCR) for 2017 |
E/AC.51/2017/11 |
Evaluation of the Office for the Coordination of Humanitarian Affairs |
E/AC.51/2017/9 |
Evaluation of the Office of the United Nations Commissioner for Human Rights |
E/AC.51/2017/8 |
Thematic evaluation of the regional commissions |
A/72/72 |
Strengthening the role of evaluation and the application of evaluation findings on programme design, delivery and policy directives |
A/71/337 (Part II) |
Activities of the Office of Internal Oversight Services on peace operations for the period from 1 January to 31 December 2016 |
A/71/798 |
Activities of the Office of Internal Oversight Services: review and evaluation of strategic deployment stocks |
E/AC.51/2017/7 |
Evaluation of the Executive Office of the Secretary-General |
E/AC.51/2017/2 |
Evaluation of the Office of the United Nations High Commissioner for Refugees |
E/AC.51/2017/3 E/AC.51/2017/3/Corr. 1 |
Evaluation of the Office of the United Nations Relief and Works Agency for Palestine Refugees in the Near East |
E/AC.51/2017/4 12 January 2017 |
Evaluation of the Economic and Social Commission for Western Asia |
E/AC.51/2017/5 12 January 2017 |
Evaluation of the Economic Commission for Europe |
E/AC.51/2017/6 12 January 2017 E/AC.51/2017/6/CORR.1 |
Evaluation of the Office of the United Nations Department of Political Affairs |
2016
REPORTING SYMBOL Reporting Date |
Description of Report |
---|---|
A/71/337 (Part I) A/71/337 (Part I)/Add.1/ A/71/337 (Part I)/Add.1/Rev.1 |
Activities of the Office of Internal Oversight Services for the period from 1 July 2015 to 30 June 2016 |
A/70/873–S/2016/441 |
Evaluation of the methods and work of the International Tribunal for the Former Yugoslavia |
E/AC.51/2016/4 |
Triennial review of the implementation of recommendations on the programme evaluation of the United Nations Office on Drugs and Crime |
E/AC.51/2016/3 24 March 2016 |
Triennial review of the implementation of recommendations on the programme evaluation of the Office for the Coordination of Humanitarian Affairs |
E/AC.51/2016/2 24 March 2016 |
Triennial review of the implementation of recommendations on the programme evaluation of the United Nations Environment Programme |
A/70/318 (Part II) 22 February 2016 |
Activities of the Office of Internal Oversight Services on peace operations for the period from 1 January to 31 December 2015 |
2015
REPORTING SYMBOL Reporting Date |
Description of Report |
---|---|
A/70/318 (Part I) A/70/318 (Part I)/Add.1 A/70/318 (Part I)/Corr.1 |
Activities of the Office of Internal Oversight Services for the period from 1 July 2014 to 30 June 2015 |
E/AC.51/2015/9 |
Evaluation of the United Nations Entity for Gender Equality and the Empowerment of Women (UN-Women) |
E/AC.51/2015/8 |
Evaluation of the International Trade Centre |
A/70/72 |
Strengthening the role of evaluation and the application of evaluation findings on programme design, delivery and policy directives |
E/AC.51/2015/6 |
Evaluation of the Economic Commission for Latin America and the Caribbean |
E/AC.51/2015/7 |
Evaluation of the Economic and Social Commission for Asia and the Pacific |
E/AC.51/2015/5 |
Evaluation of the Office of the United Nations High Commissioner for Refugees |
E/AC.51/2015/3 |
Thematic evaluation of monitoring and evaluation of the Millennium Development Goals: lessons learned for the post-2015 era |
E/AC.51/2015/4 |
Evaluation of the United Nations Conference on Trade and Development |
A/69/308 (Part II) |
Activities of the Office of Internal Oversights Services on peace operations for the period from 1 January to 31 December 2014 |
E/AC.51/2015/2 |
Evaluation of the United Nations Human Settlements Programme (UN-Habitat) |
2014
REPORTING SYMBOL Reporting Date |
Description of Report |
---|---|
A/69/308 (Part I) A/69/308 (Part I)/Add.1 |
Activities of the Office of Internal Oversight Services for the period from 1 July 2013 to 30 June 2014 |
E/AC.51/2014/2 |
CPC - OIOS Report on Triennial Review of DESA |
A/68/787 |
Evaluation of the Implementation and Results of Protection of Civilians Mandates in United Nations Peacekeeping Operations |
A/68/337 (Part II) |
Activities of the Office of Internal Oversight Services on Peace Operations for the Period 1 January to 31 December 2013: Report of the Office of Internal Oversight Services |
2013
REPORTING SYMBOL Reporting Date |
Description of Report |
---|---|
A/68/337(Part I) A/68/337(Part I)/Add.1 |
Activities of the Office of Internal Oversight Services for the period from 1 July 2012 to 30 June 2013 |
A/68/70 |
Strengthening the role of evaluation and the application of evaluation findings on programme design, delivery and policy directives |
E/AC.51/2013/4 |
Evaluation of the United Nations Office on Drugs and Crime |
E/AC.51/2013/5 |
Review of the evaluation capacity of the Office of the United Nations High Commissioner for Refugees |
A/67/795 |
Review of the reporting by United Nations peacekeeping missions on the protection of civilians |
A/67/297(Part II) |
Activities of the Office of Internal Oversight Services on peacekeeping operations for the period from 1 January to 31 December 2012 |
A/67/751 |
Comprehensive report on pilot project designated by the General Assembly in resolution 63/287 |
E/AC.51/2013/3 |
Evaluation of the Office for the Coordination of Humanitarian Affairs |
E/AC.51/2013/2 |
Programme evaluation of the United Nations Environment Programme |
A/67/695 |
Comprehensive audit of air travel activities and related practices |
2012
REPORTING SYMBOL Reporting Date |
Description of Report |
---|---|
A/67/330 |
In-depth technical construction audit of the capital master plan |
A/67/297(Part I) A/67/297(Part I)/Add.1 |
Activities of the Office of Internal Oversight Services for the period from 1 July 2011 to 30 June 2012 |
E/AC.51/2012/4 |
Triennial review of the implementation of recommendations made by the Committee for Programme and Coordination at its forty-ninth session on the evaluation of United Nations support for least developed countries, landlocked developing countries, small island developing States and Africa |
E/AC.51/2012/3 |
Triennial review of the implementation of recommendations made by the Committee for Programme and Coordination at its forty-ninth session on the thematic evaluation of lessons learned: protocols and practices |
E/AC.51/2012/2 |
Triennial review of the implementation of recommendations made by the Committee for Programme and Coordination at its forty-ninth session on the thematic evaluation of United Nations coordinating bodies |
A/66/755 |
Comprehensive report on the implementation of the pilot project designated by the General Assembly in resolution 63/287 |
A/66/286(Part II) |
Peacekeeping operations - Administrative and budgetary aspects of the financing of the United Nations peacekeeping operations |
A/66/741 |
Programme evaluation of performance and achievement of results: United Nations peacekeeping activities in the Democratic Republic of the Congo |
A/66/740 |
Programme evaluation of the United Nations Stabilization Mission in Haiti |
A/66/714 |
Audit of the implementation of the global field support strategy |
A/66/674 |
Proposal on the dissemination and distribution of audit reports |
2011
REPORTING SYMBOL Reporting Date |
Description of Report |
---|---|
A/66/286(Part I) A/66/286(Part I)/Add.1 |
Activities of the Office of Internal Oversight Services for the period from 1 July 2010 to 30 June 2011 |
A/66/180 |
Review of the organizational framework of the public information function of the Secretariat |
A/66/179 |
Audit of capital master plan procurement and contract management, including change orders |
E/AC.51/2011/2 |
Programme evaluation of the Department of Economic and Social Affairs |
A/66/71 |
Strengthening the role of evaluation and the application of evaluation findings on programme design, delivery and policy directives |
E/AC.51/2011/3 |
Triennial review of the implementation of recommendations made by the CPC at its forty-eighth session on the in-depth evaluation of political affairs: field special political missions led by the DPA but supported by the DFS |
A/65/765 |
Preliminary report on the Implementation of the pilot project designated by the GA in Resolution 63/287 |
A/65/271(Part II) |
Peacekeeping operations - Administrative and budgetary aspects of the financing of the United Nations peacekeeping operations |
A/65/762 |
Thematic evaluation of the cooperation between Department of Peacekeeping Operations / Department of Field Support and regional organizations: "Cooperation with regional organisations in peacekeeping has contributed to the overall capacity of the United Nations to deploy and sustain peacekeeping missions, though organizational differences between the United Nations and partners have created multiple challenges in operational cooperation" |
A/65/752 |
Programme evaluation of the performance and the achievement of results by the United Nations in Sudan (UNMIS): "Although the original objective of the Comprehensive Peace Agreement (CPA) to make unity attractive has not been met, UNMIS's support to the implementation of the CPA has contributed to the holding of the ceasefire" |
2010
REPORTING SYMBOL Reporting Date |
Description of Report |
---|---|
A/65/271(Part I) A/65/271(PartI)/Add.1 A/65/271(Part I)/ Corr.1 |
Report on the activities of the Office of Internal Oversight Services for the period from 1 July 2009 to 30 June 2010 |
A/65/266 |
Thematic evaluation of gender mainstreaming in the UN Secretariat |
E/AC.51/2010/2 |
Triennial review of the implementation of recommendations made by the CPC at its 47th Session on the in-depth evaluation of political affairs |
A/64/712 |
Programme evaluation of the performance and the achievement of results by UNMIL |
A/64/326(Part II) |
Peacekeeping operations - Administrative and budgetary aspects of the financing of the United Nations peacekeeping operations |
2009
REPORTING SYMBOL Reporting Date |
Description of Report |
---|---|
A/64/587 |
Review of practice of sharing consultants reports on management related issues |
A/64/511 |
Audit of conference services put at the disposal of the Human Rights Council in 2009 |
A/64/369 |
Audit of procurement management in the Secretariat |
A/64/326 (Part I) A/64/326 (Part I)/Add.1 |
Report on the activities of the Office of Internal Oversight Services for the period 1 July 2008 to 30 June 2009 |
A/64/294 |
Follow-up audit of the management of special political missions by the Department of Political Affairs |
A/64/203 A/64/203/Corr.1 |
Efficiency of the implementation of the mandate of the Office of the UN High Commissioner for Human Rights |
A/64/201 |
Audit of human resources management at the Office of the UN High Commissioner for Human Rights |
A/64/166 |
Evaluation of the integrated global management initiative of the Department for GA and Conference Management |
A/63/837 |
Audit of the Secretariat's structure for managing and sustaining peacekeeping operations |
E/AC.51/2009/6 |
Thematic evaluation of United Nations coordinating bodies: “Coordinating bodies add value in aligning policies and sharing information, but are less effective in coordinating programme delivery and strengthening organizational performance” |
E/AC.51/2009/3
9 Apr 2009 |
Triennial review of the implementation of recommendations made by the Committee for Programme and Coordination at its forty-sixth session on the in-depth evaluation of political affairs |
E/AC.51/2009/2
2 Apr 2009 |
Evaluation of UN support for least developed countries, small island developing States and Africa: “Misalignment between expectations, capacities and accountability arrangements hinders programmatic focus and attainment of results” |
E/AC.51/2009/4 26 Mar 2009 |
Triennial review of the implementation of recommendations made by the CPC at its 46th session on the thematic evaluation of knowledge management networks in the pursuit of the goals of the Millennium Declaration |
A/63/302 (Part II)
23 Feb 2009 |
Peacekeeping operations |
A/64/63 |
Strengthening the role of evaluation and the application of evaluation findings on programme design, delivery and policy directives: “While evaluation is playing a positive role in improving performance, overall evaluation capacity of the Secretariat continues to be inadequate” |
E/AC.51/2009/5 |
Thematic evaluation of lessons learned: protocols and practices: “Learning lessons for improving organizational efficiency and effectiveness is weak” |
A/63/713 |
Programme evaluation of the performance and the achievement of results by the United Nations Operation in Côte d'Ivoire : “Aspects of the Ouagadougou Agreement are impacting the mission's overall achievement of results, however, its presence remains critical to the peace process” |
A/63/668 |
Audit of the Of extraordinary measures for the African Union-United Nations Hybrid Operations in Darfur |
2008
REPORTING SYMBOL Reporting Date |
Description of Report |
---|---|
A/63/379 26 Sept 2008 |
Comprehensive management audit of the Department of Safety and Security |
A/63/329 25 Aug 2008 A/63/329/Add.1 |
Report on the activities of the Procurement Task Force for the period of 1 July 2007 to 31 July 2008 |
A/63/302(Part I) A/63/302(Part I)/Add.1 |
Report on the activities of the Office of Internal Oversight Services for the period 1 January to 31 December 2008 and Addendum |
A/63/268 22 Sept 2008 |
Review of results-based management (RBM) at the United Nations Secretariat: RBM has been an administrative chore of little value to accountability and decision-making |
A/63/221 22 Sept 2008 |
In-Depth Evaluation of the Office of Human Resources Management (OHRM): Key Objectives Remain Unachieved, OHRM Faces Significant Challenges |
A/63/266 11 Aug 2008 |
Comprehensive audit of the capital master plan |
A/63/94 30 Jun 2008 |
Audit of the existing special arrangements governing the recruitment of temporary assistance staff in the language services across the four main duty stations |
A/62/807 18 Apr 2008 |
Audit of the United Nations Interim Administration Mission in Kosovo mandate implementation |
E/AC.51/2008/2 14 Apr 2008 |
In-depth evaluation of political affairs: field special political missions led by the Department of Political Affairs but supported by the Department of Field Support |
E/AC.51/2008/4 27 Mar 2008 E/AC.51/2008/4/Add.1 |
Triennial review of the Thematic evaluation of the linkages between Headquarters and field activities: a review of best practices for poverty eradication in the framework of the United Nations Millennium Declaration |
E/AC.51/2008/3 27 Mar 2008 |
Triennial review of the implementation of the recommendations made by the CPC at its 45th session on the in-depth evaluation of the UN Habitat |
A/62/281(Part II) 25 Feb 2008 |
Report on the activities of the Office of Internal Oversight Services for the period 1 January to 31 December 2007 |
2007
REPORTING SYMBOL Reporting Date |
Description of Report |
---|---|
A/62/272 5 Oct 2007 |
Report on the activities of the Procurement Task Force for the 18-month period ended 30 June 2007 |
A/62/281(Part I) 17 Aug 2007 A/62/281(Part I)/Add.1 |
Report on the activities of the Office of Internal Oversight Services for the period 1 January to 31 December 2007 |
A/62/176 2 Aug 2007 |
Report on the audit of the activities of the Thessaloniki Centre for Public Service Professionalism |
E/AC.51/2007/2/Add.4 1 May 2007 |
In-depth evaluation of political affairs: special political missions |
E/AC.51/2007/2 13 Apr 2007 |
In-depth evaluation of political affairs: summary report |
E/AC.51/2007/2/Add.3 28 Mar 2007 |
In-depth evaluation of political affairs: decolonization and question of Palestine |
A/61/846 10 Apr 2007 |
Audit of the application of the best value for money principle in UN procurement |
A/61/841 5 Apr 2007 |
Investigation into allegations of SEA in the Ituri region (Bunia) in MONUC |
E/AC.51/2007/2/Add.1 29 Mar 2007 |
In-depth evaluation of political affairs: electoral assistance |
E/AC.51/2007/2/Add.2 29 Mar 2007 |
In-depth evaluation of political affairs: Security Council affairs |
E/AC.51/2007/3 29 Mar 2007 |
The triennial review on the in-depth evaluation of the programme on the public administration, finance and development |
A/61/264 (Part II) 26 Feb 2007 |
Report on the activities of OIOS (Part II), Peacekeeping Operations |
A/61/760 23 Feb 2007 A/61/760/Corr.1 |
Report on the horizontal audit of fuel management in peacekeeping missions |
A/61/743 14 Feb 2007 |
Report on the audit of the management structures of the DPKO |
2006
REPORTING SYMBOL Reporting Date |
Description of Report |
---|---|
A/61/669 22 Dec 2006 |
Report on the audit and investigative reviews of the tsunami relief operations conducted by UN Secretariat, funds and programmes and specialized agencies |
A/61/357 19 Sep 2006 |
Report on audit of the management of special political mission by DPA |
A/61/264 (Part I) 15 Aug 2006 A/61/264 (Part I)/Add.1 |
Report on the activities of OIOS (Part I) |
A/60/901 14 Jul 2006 |
Report on proposals for strengthening the OIOS |
A/61/64 20 Apr 2006 |
Report on the programme performance of the United Nations for the biennium 2004-2005 (PPR) |
A/61/83 16 May 2006 |
Strengthening the role of evaluation and the application of evaluation findings on programme design, delivery and policy directives |
E/AC.51/2006/4 9 May 2006 |
In-depth evaluation of political affairs |
E/AC.51/2006/3 9 May 2006 |
Usefulness of the pilot thematic evaluation |
E/AC.51/2006/5 16 Mar 2006 |
Triennial review of the in-depth evaluation of the programme on the law of the sea and ocean affairs |
E/AC.51/2006/2 24 Mar 2006 |
Thematic evaluation of knowledge management networks |
A/60/713 9 Mar 2006 |
Global review of discipline |
A/60/717 13 Mar 2006 |
Comprehensive management audit of DPKO |
A/60/720 14 Mar 2006 |
Investigation conducted by the Investigations Task Force into fraud and corruption allegations at Pristina Airport |
A/61/61 17 Feb 2006 |
Inspection of the programme and administrative management of ESCWA |
A/60/682 17 Feb 2006 |
Audit of the standard costs applied to Headquarters overhead |
2005
REPORTING SYMBOL Reporting Date |
Description of Report |
---|---|
A/60/588 13 Dec 2005 |
Review of military involvement in civil assistance in peacekeeping operations |
A/60/596 16 Nov 2005 |
Review of the effectiveness of military information management in UN peacekeeping Operations |
A/60/346 9 Sep 2005 A/60/346/Corr.1 |
Report of the Secretary-General on the activities of OIOS, 1 July 2004 - 30 June 2005 |
A/60/291 23 Aug 2005 |
Utilization and management of funds for strengthening the security and safety of UN premises |
A/60/288 22 Aug 2005 |
Capital Master Plan for the period from August 2004 through July 2005 |
A/60/281 19 Aug 2005 |
Review of INSTRAW |
A/60/120 14 Jul 2005 |
Inspection of programme and administrative management of the subregional offices of the Economic Commission for Africa |
A/60/73 28 Apr 2005 |
Proposals on the strengthening and monitoring of programme performance and evaluation |
E/AC.51/2005/2 12 Apr 2005 |
Evaluation of linkages between HQ and field in poverty eradication |
E/AC.51/2005/3 12 Apr 2005 |
In-depth evaluation of UN-Habitat |
A/59/764 1 Apr 2005 |
Review of operational capacity of United Nations Military Observers |
E/AC.51/2005/4 24 Mar 2005 |
Triennial review of the implementations made by CPC on the in-depth evaluation of the sub-programmes on GA and ECOSOC support and coordination |
E/AC.51/2005/5 17 Mar 2005 |
Triennial review of the implementation of the recommendations made by the CPC at its 42nd session on the in-depth evaluation of legal affairs |
A/59/702 15 Feb 2005 |
Audit of Field security management |
A/59/698 5 Jan 2005 |
Audit of mission subsistence allowance policies and procedures |
A/59/661 5 Jan 2005 |
Report on investigation into allegations of sexual exploitation and abuse in MONUC |
2004
REPORTING SYMBOL Reporting Date |
Description of Report |
---|---|
E/CN.4/2005/55 5 Nov 2004 |
Report on the evaluation of the United Nations Voluntary Fund for Victims of Torture |
A/59/546 2 Nov 2004 |
First year of experience of regional investigations in 2 hubs, Vienna and Nairobi |
A/59/420 6 Oct 2004 |
UN capital master plan for the period of August 2003 - July 2004 |
A/59/408 1 Oct 2004 |
Management review of the appeals process at the UN |
A/59/396 1 Oct 2004 |
Report on the utilization and management of funds appropriated during the 2002-2003 biennium for strengthening the security and safety of UN premises |
A/59/388 27 Sept 2004 |
Report on the availability in local labour markets of the skills for which international recruitment for the General Service category takes place |
A/59/359 13 Sept 2004 |
Report of the Secretary-General on the activities of OIOS, 1 July 2004 - 30 June 2004 |
A/59/331 3 Sept 2004 |
Report on children and armed conflict |
A/59/253 24 Sept 2004 |
Impact of the human resources management reform |
A/59/373 20 Sept 2004 |
Review of the operation and management of United Nations Libraries |
A/59/347 9 Sep 2004 |
Audit of safeguarding air safety standards while procuring air services for the UN peacekeeping missions |
A/59/229 11 Aug 2004 |
Inspection of programme management and administrative practices of the ITC UNCTAD/WTO |
A/59/152 15 Jul 2004 |
Follow-up audit polices and procedures of DPKO recruitment |
A/59/133 7 Jul 2004 A/59/133/Corr.1 |
Integration of global management of conference services |
A/59/79 5 May 2004 |
Strengthening the role of evaluation findings in programme design, delivery and policy directives |
A/59/69 13 Apr 2004 |
Report on the programme performance of the United Nations for the biennium 2002-2003 (PPR) |
E/AC.51/2004/5 15 Apr 2004 E/AC.51/2004/5/Corr.1 |
Triennial review of the in-depth evaluation of the population programme |
E/AC.51/2004/4 22 Mar 2004 |
Triennial review of the in-depth evaluation of sustainable development |
E/AC.51/2004/3 16 Mar 2004 |
In-depth evaluation of law of public administration, finance and development |
E/AC.51/2004/2 3 Mar 2004 |
On further development of topics for a pilot thematic evaluation |
A/58/785 6 May 2004 |
Audit of Regional Commissions |
A/58/746 25 Mar 2004 |
Evaluation of the impact of the recent restructuring of the DPKO |
A/58/725 1 Mar 2004 |
The implementation of the recommendations of OIOS on the Investment Management Service of the UNJSPF |
A/58/704 6 Feb 2004 |
Audit of the policies and procedures for recruiting DPKO staff |
A/58/708 2 Feb 2004 |
Report on strengthening the investigation functions in the United Nations |
A/58/677 7 Jan 2004 |
Report on the review of the Office of the Prosecutor at the ICT for Rwanda and for the former Yugoslavia |
2003
REPORTING SYMBOL Reporting Date |
Description of Report |
---|---|
A/58/613 28 Nov 2003 |
Report on the administration of peacekeeping trust funds |
A/58/592 13 Nov 2003 |
Investigation into the fraudulent diversion of 4.3 million by a senior staff member of the reconstruction pillar of the United Nations Interim Administration Mission in Kosovo (UNMIK) |
A/58/364 11 Sept 2003 |
Report on the activities of the Internal Oversight Services |
A/58/342 4 Sept 2003 |
The United Nations capital master plan for the period from January to July 2003 |
A/58/294 19 Aug 2003 |
Audit of the functioning of the Headquarters Committee on Contracts |
A/58/211 4 Aug 2003 |
Review of duplication, complexity and bureaucracy in UN administrative processes and procedures |
A/58/81 20 May 2003 |
Audit of the Investment Management Service of the UN Joint Staff Pension Fund |
E/AC.51/2003/2 13 May 2003 |
Proposed evaluation themes |
E/AC.51/2003/3 2 Apr 2003 |
In-depth evaluation of the programme on the law of the sea and ocean affairs |
E/AC.51/2003/4 16 Apr 2003 |
Triennial review of the implementation of the recommendations made by the CPC at its 40th session on the in-depth evaluation of global development trends, issues and policies, global approaches to social and microeconomic issues and policies, and the corresponding subprogrammes in the regional commissions |
E/AC.51/2003/5 11 Apr 2003 |
Triennial review of the implementation of the recommendations made by the CPC at its 40th session on the in-depth evaluation of the advancement of women programme |
A/57/747 13 Mar 2003 |
Review of the structure and operations of UN Information Centres |
A/57/726 10 Feb 2003 |
Implementation of all provisions of General Assembly resolution 55/258 on human resources management |
A/57/718 28 Jan 2003 |
Procurement of goods and services through letters of assist |
2002
REPORTING SYMBOL Reporting Date |
Description of Report |
---|---|
A/57/622 25 Nov 2002 |
Follow-up review of the status of recommendations of the OIOS on mission liquidation activities at the UN |
A/57/488 21 Oct 2002 |
Management review of the Office of the United Nations High Commissioner for Human Rights |
A/57/494 7 Oct 2002 |
Regional Investigators Report |
A/57/474 15 Oct 2002 |
Implementation of all provisions of General Assembly resolution 55/231 on results-based budgeting |
A/57/451 4 Oct 2002 |
Report of the Office of Internal Oversight Services for the period from 1 July 2001 to 30 June 2002 |
A/57/465 11 Oct 2002 |
Investigation into sexual exploitation of refugees by aid workers in West Africa |
A/57/224 19 Jul 2002 |
Audit of the policies and procedures for recruiting staff for the Department of Peacekeeping Operations |
A/56/956 8 Jul 2002 |
Possible discrimination due to nationality, race, sex, religion and language in recruitment, promotion and placement |
A/57/68 23 Apr 2002 |
Strengthening the role of evaluation findings in programme design, delivery and policy directives |
A/57/62 18 Apr 2002 |
Programme performance of the UN for the biennium 2000-2001 |
A/56/930 23 Apr 2002 |
Inspection of programme management and administrative practices in the Economic Commission for Latin America and the Caribbean |
E/AC.51/2002/7 26 Apr 2002 |
Triennial review of the implementation of the recommendations made by the CPC at its thirty-ninth session on the in-depth evaluation of the electoral assistance programme |
E/AC.51/2002/6 18 Apr 2002 |
Triennial review of the implementation of the recommendations made by the CPC at its thirty-ninth session on the in-depth evaluation of the disarmament programme |
E/AC.51/2002/5 2 Apr 2002 |
In-depth evaluation of legal affairs |
A/56/907 11 Apr 2002 |
Audit of the United Nations International Research and Training Institute for the Advancement of Women |
A/56/906 9 Apr 2002 |
Audit of a contract for the provision of airfield services in the UN Organization Mission in the Democratic Republic of the Congo |
E/AC.51/2002/4 9 Apr 2002 |
In-depth evaluation of the subprogrammes on General Assembly and Economic and Social Council affairs and Economic and Social Council support and coordination |
A/56/903 4 Apr 2002 |
Update of oversight activities concerning the oil-for-food programme and the UN Compensation Commission |
A/56/896 2 Apr 2002 |
Update on the status of the recommendations of the OIOS on mission liquidation activities at the UN |
A/56/879 24 Mar 2002 |
Post-implementation review of the Integrated Management Information System at UNHQ |
A/56/836 26 Feb 2002 |
Follow-up investigation into possible fee-splitting arrangements between defence counsel and indigent detainees at the International Tribunal for Rwanda and International Tribunal for the formal Yugoslavia |
A/56/817 12 Feb 2002 |
Inspection of programme management and administrative practices in the Department for Disarmament Affairs |
A/56/823 19 Feb 2002 |
Enhancing the internal oversight mechanisms in operational funds and programmes, updated views |
2001
REPORTING SYMBOL Reporting Date |
Description of Report |
---|---|
A/56/733 21 Dec 2001 |
Investigation into allegation of refugee smuggling at the Nairobi Branch Office of the Office of the United Nations High Commissioner for Refugees |
A/56/689 7 Dec 2001 |
Investigation into allegation of misconduct and mismanagement of the "boat project" at the UN Office for Drug Control and Crime Prevention |
A/56/648 26 Nov 2001 |
Audit of the establishment and management of mission subsistence allowance rates |
A/56/620 14 Nov 2001 |
Inspection of the administrative and management practices of the UN Office at Nairobi |
A/56/381 19 Sept 2001 |
Report of the Office of Internal Oversight Services for the period from 1 July 2000 to 30 June 2001 |
A/56/202 20 Jul 2001 |
Audit of the policies and procedures of the DPKO for recruiting international civilian staff for field mission |
A/56/83 1 Jun 2001 |
Inspection of programme management and administrative practices in the Office for Drug Control and Crime Prevention |
A/56/68 8 May 2001 |
Implementation of the International Strategy for Disaster reduction |
E/AC.51/2001/4 4 May 2001 |
Triennial review of the implementation of the recommendations made by the CPC at its thirty-eighth session on the in-depth evaluation of the UNDCP |
E/AC.51/2001/5 26 Apr 2001 |
Triennial review of the implementation of the recommendations made by the CPC at its thirty-eighth session on the in-depth evaluation of the UN crime prevention and criminal justice |
E/AC.51/2001/3 4 Apr 2001 |
In-depth evaluation of the population programme |
E/AC.51/2001/2 27 Mar 2001 |
In-depth evaluation of sustainable development. |
A/55/826 8 Mar 2001 A/55/826/Corr.1 |
Enhancing the internal oversight mechanisms in operational funds and programmes, updated version |
A/55/812 1 Mar 2001 |
Management audit of United Nations civilian police operations |
A/55/803 23 Feb 2001 |
Inspection of the consolidation of technical support services in DGAACS |
A/55/759 1 Feb 2001 |
Investigation of possible fee-splitting arrangements at ICTR and ICTY |
A/55/750 26 Jan 2001 |
Inspection of the outcome of the consolidation of the three former economic and social departments into the Department of Economic and Social Affairs |
A/55/746 25 Jan 2001 |
Follow-up audit on the implementation of procurement reform |
A/55/735 17 Jan 2001 |
Experiences learned from the use of resident auditors at peacekeeping missions |
2000
REPORTING SYMBOL Reporting Date |
Description of Report |
---|---|
A/55/469 11 Oct 2000 |
Rules and procedures to be applied for the investigation functions performed by the Office of Internal Oversight Services |
A/55/436 2 Oct 2000 |
Report of the Office of Internal Oversight Services for the period from 1 July 1999 to 30 June 2000 |
A/55/397 19 Sep 2000 |
Follow-up audit of the recruitment process in the Office of Human Resources Management |
A/55/353 10 Jun 2000 |
Investigation into the misdirection of contributions made by Member States to the United Nations Environment Programme Trust Fund account |
A/55/352/Corr.1 19 Oct 2000 |
Proactive investigation of the education grant entitlement |
A/55/352 10 Jun 2000 |
Proactive investigation of the Education Grant entitlement |
A/55/85 10 Jun 2000 |
Ways in which the full implementation and the quality of mandated programmes and activities could be ensured and could be better assessed by and reported to Member States |
A/55/73 22 May 2000 |
Programme Performance Report for the biennium 1998-1999 |
A/55/63 4 Apr 2000 |
Strengthening the role of evaluation findings in programme design, delivery and policy directives |
A/54/836 6 Apr 2000 |
Audit of the Office of the United Nations High Commissioner for Human Rights Field Operation in Rwanda |
E/AC.51/2000/3 29 Mar 2000 |
In-depth evaluation of the Advancement of Women Programme |
E/AC.51/2000/5 29 Mar 2000 |
Triennial review of the implementation of the recommendations made by the CPC at its 37th session on the in-depth evaluation of the DHA |
A/54/817 28 Mar 2000 |
Follow up to the 1996 review of the programme and administrative practices of the UNEP |
E/AC.51/2000/4 24 Mar 2000 |
Triennial Review of the Statistics programme |
E/AC.51/2000/2 24 Mar 2000 |
In-depth evaluation of the global development trends, issues and policies, and global approaches to social and micro-economic issues and policies, and the corresponding subprogrammes in the regional commissions |
A/54/765 23 Feb 2000 |
Audit of contingent-owned equipment procedures and payments to troop-contributing countries |
A/54/764 23 Feb 2000 |
Follow-up review of the Programme and administrative practices of the UN Centre for Human Settlement(Habitat) |
1999
REPORTING SYMBOL Reporting Date |
Description of Report |
---|---|
A/54/683 20 Dec 1999 |
Investigation into allegations of fraud in travel at the United Nations Mission in Bosnia and Herzegovina |
A/54/548 16 Nov 1999 |
Investigation into $6.9 million procurement of quartering area goods in the UN Angola Verification Mission |
A/54/413 29 Sept 1999 |
Investigation into allegations concerning an electronic commerce project at UNCTAD |
A/54/410 28 Sept 1999 |
Management audit of ECA and ESCAP conference centres |
A/54/394 23 Sept 1999 |
Audit of the liquidation of peacekeeping missions |
A/54/393 23 Sept 1999 |
Annual Report of OIOS for the period 1 July 1998 - 31 June 1999 |
A/54/367 21 Sept 1999 |
Investigation into the UNRWA field office in Lebanon |
A/54/335 9 Sept 1999 |
Audit of the management of service and ration contracts in peacekeeping missions |
A/54/334 9 Sept 1999 |
Review of OCHA |
A/54/169 13 July 1999 |
Investigation into the award of a fresh rations contract in a United Nations peacekeeping mission |
A/54/157 30 June 1999 |
Review of common services in the United Nations |
A/54/120 3 June 1999 |
Audit and Investigation of ICTY |
A/54/117 2 June 1999 |
Ways in which full implementation and the quality of mandated programmes and activities could be ensured and could be better assessed by and reported to Member States |
E/AC.51/1999/5 8 Apr 1999 |
Triennial review of the implementation of the recommendations made by the CPC at its 36th section on the evaluation of peacekeeping: termination phase |
E/AC.51/1999/4 3 March 1999 |
Triennial review of the implementation of the recommendations made by the CPC at its 36th section on the evaluation of DPI |
E/AC.51/1999/3 23 March 1999 |
In-depth evaluation of Electoral Assistance |
E/AC.51/1999/2 31 March 1999 |
In-depth evaluation of the Disarmament Programme |
A/53/843 1 Mar 1999 |
Review of Procurement-related Arbitration Cases |
A/53/829 16 Feb 1999 |
Increase in Costs of the Integrated Management Information System (IMIS) Development Contract |
A/53/811 28 Jan 1999 |
Allegations of theft of funds by a United Nations Conference on Trade and Development (UNCTAD) staff member |
1998
REPORTING SYMBOL Reporting Date |
Description of Report |
---|---|
A/53/642 5 Nov 1998 |
Audit of the Employment of Retirees |
A/53/467 7 Oct 1998 |
Audit of the United Nations Health Insurance Programme |
A/53/428 18 Sept 1998 |
Annual Report of the Office of Internal Oversight Services (OIOS) for the period 1 July 1997 to 30 June 1998 |
A/52/1020 18 Aug 1998 |
Audit of the Commercial Insurance Programme |
A/52/1010 5 Aug 1998 |
Allegations of Insufficient Use of Expertise in Procurement Planning of Aviation Services in Peace-keeping Missions during the Biennium 1994-1995 |
A/53/122/Add.1 13 May 1998 |
Report of the Secretary-General on the Programme Performance of the United Nations for the Biennium(1996-1997) |
A/52/887 8 May 1998 |
Review of the procurement of Lysol by UNHCR |
A/52/886 6 May 1998 |
Termination benefits paid to the locally employed civilians in UNFICYP |
A/52/881 28 Apr. 1998 |
Audit of the procurement process in UNAVEM |
E/AC.51/1998/5 8 Apr. 1998 |
Triennial review of the implementation of recommendations made by the CPC at its 35th session on the evaluation of the programme on environment |
A/53/90 25 Mar. 1998 |
Strengthening the role of evaluation findings in programme design, delivery and policy directives |
E/AC.51/1998/4 30 Mar. 1998 |
Triennial review of the implementation of recommendations on the in-depth evaluation of peacekeeping: start-up phase |
A/52/821 20 Mar. 1998 |
Audit of the second United Nations Conference on Human Settlements (Habitat II) |
E/AC.51/1998/3 17 Mar. 1998 |
In-depth evaluation of the United Nations Crime Prevention and Criminal Justice Division |
E/AC.51/1998/2 17 Mar. 1998 |
In-depth evaluation of the United Nations International Drug Control Programme |
A/52/814 5 Mar. 1998 |
Audit of the use of consultants |
A/52/813 5 Mar. 1998 |
Review of the implementation of procurement reform |
A/52/784 6 Feb. 1998 |
Follow-up on the audit and investigation of the ICTR |
A/52/777 27 Jan 1998 |
Review of programme management at the the Crime Prevention and Criminal Justice Division |
A/52/776 27 Jan 1998 |
Audits of the Regional Commissions |
1997
REPORTING SYMBOL Reporting Date |
Description of Report |
---|---|
A/52/426 2 Oct 1997 |
Annual Report of the Office of Internal Oversight Services (OIOS) for the period 1 July 1996 to 30 June 1997 |
A/52/339 10 Sept 1997 |
Investigation into the alleged conflict of interest in the UNCHS (Habitat) |
A/51/933 24 Jun1997 |
Review of the programme and administrative practices of the Secretariat of the International Trade Centre (UNCTAD/WTO) |
A/51/897 13 May 1997 |
Audit of the United Nations postal administration |
A/51/884 23 Apr 1997 |
Review of the programme and administrative practices of the United Nations Centre for Human Settlements (UNCHS/Habitat) |
E/AC.51/1997/5 21 Apr 1997 |
Triennial review of the in-depth evaluation of the Social Development Programme |
E/AC.51/1997/4 11 Apr 1997 |
Topics for future in-depth evaluations |
E/AC.51/1997/3 9 Apr 1997 |
In-depth evaluation of the Department of Humanitarian Affairs |
E/AC.51/1997/2 25 Mar 1997 |
In-depth evaluation of the United Nations Statistics Programme |
A/51/824 11 Mar 1997 |
Review of the resource requirements of the International Criminal Tribunal for the former Yugoslavia in 1997 |
A/51/810 27 Feb 1997 |
Review of the United Nations Environment Programme (UNEP) and the administrative practices of its secretariat, including the United Nations Office in Nairobi (UNON) |
A/51/804 21 Feb 1997 |
Review of outsourcing practices at the United Nations |
A/51/803 20 Feb 1997 |
Audit of the United Nations Logistics Base (UNLB) in Brindisi |
A/51/802 20Feb1997 |
Audit of headquarters catering operations |
A/51/801 20 Feb 1997 |
Report of the Secretary-General on enhancing Internal Oversight mechanisms in operational funds and programmes |
A/51/789 6 Feb 1997 |
Audit and investigation of the International Criminal Tribunal for Rwanda |
1996
REPORTING SYMBOL Reporting Date |
Description of Report |
---|---|
A/51/486 11 Oct 1996 |
Inquiry into seminars of the Special Committee |
A/51/467 8 Oct 1996 |
Investigation of the United Nations Access Control System |
A/51/432 30 SEP 1996 |
Annual report of the Office of Internal Oversight Services (OIOS) for the Period 1 July 1995 to 30 June 1996 |
A/51/305 23 Aug 1996 |
Review of the management structure in the civilian staff component of the United Nations Peace Force (UNPF) |
A/51/302 22 Aug 1996 |
Management audit of United Nations Global Cargo and Motor Vehicle Insurance Programmes |
A/50/1005 19 Jul 1996 |
Management audit of electronic mail at the United Nations Secretariat |
A/50/1004 19 Jul 1996 |
Investigation of allegations of misappropriations of United Nations assets at the United Nations Gift Centre |
A/51/128 6 May 1996 A/51/128/Add.1 |
Report of the Secretary-General on the programme performance of the United Nations for the biennium 1994/1995 |
A/50/945 30 Apr 1996 |
Audit of procurement handled by the Contracts and Procurement Service of the Department for Development Support and Management Services (DDSMS) |
A/51/88 4 Apr 1996 |
Strengthening the role of evaluation findings in programme design, delivery and policy directives |
E/AC.51/1996/3 22 Mar 1996 |
Final report on the in-depth evaluation of peace-keeping operations: termination phase |
E/AC.51/1996/2 21 Mar 1996 |
Final report on the in-depth evaluation of the Department of Public Information |
E/AC.51/1996/4 21 Mar 1996 |
Triennial review of the implementation of recommendations made by the Committee on Programme and Coordination (CPC) at its 32nd session on the evaluation of the Office of the United Nations High Commissioner for Refugees (UNHCR) |
1995
REPORTING SYMBOL Reporting Date |
Description of Report |
---|---|
A/50/719 14 Dec 1995 |
Review of the programme and administrative practices of the United Nations Conference on Trade and Development (UNCTAD) Secretariat |
A/50/791 30 Nov 1995 |
Audit report on the United Nations Access Control System project |
A/50/459 2 Oct 1995 |
Annual report of the Office for Internal Oversight Services (OIOS) for the period 15 November 1994 to 30 June 1995 |
A/49/959 31 Aug 1995 |
Review of the Field Administration and Logistics Division (FALD), Department of Peace-keeping Operations (DPKO) |
A/49/937 5 Jul 1995 |
Follow-up report on MINURSO |
A/49/914 6 Jun 1995 |
Audit of the UNPROFOR personnel pilot project |
A/49/892 26 Apr 1995 |
Review of the programme and administrative practices of the United Nations Centre for Human Rights |
A/49/891 19 Apr 1995 |
Review of the Economic Commission for Africa (ECA), the Economic and Social Commission for Western Asia (ESCWA), and the Economic Commission for Europe (ECE) |
A/49/884 5 Apr 1995 |
Investigation of allegations of irregularities and mismanagement in MINURSO |
E/AC.51/1995/2 17 Mar 1995 |
Final report on the in-depth evaluation of peace-keeping operations: start-up Phase |
E/AC.51/1995/3 8 Mar 1995 |
In-depth evaluation of the programme on environment |
A/49/843 2 Feb 1995 |
Progress of the investigation and action thereon to Determine Responsibility for the theft of US$3.9 million in UNOSOM II |